Residents of Pattabiram have urged the Highways Department to build a roundabout on the Chennai–Tiruvallur High Road (CTH), also known as the Chennai–Tirupati–Renigunta Road, near the flyover, replacing Level Crossing 2 on the railway siding. According to resident Roy Rozario, the six-way junction turns chaotic during peak hours in the absence of a roundabout. Besides the CTH Road lanes, roads to and from Poonamallee and M.G. Road join the junction, which is used by people heading to the police station, TIDEL Park, hotels, schools and colleges.

Rozario said accidents occur frequently at the spot because people drive on the wrong side or recklessly. He added that the government had announced long ago that a roundabout would be constructed at the location, and residents hope it comes up soon. Residents have also urged the department to open the other side of the flyover to traffic. Activist T. Sadagopan said the structure has been completed, with only works such as lighting, removal of excess cement concrete and painting remaining, and that people are already driving on the incomplete side to reach the other side despite the rough surface.

Residents said the space beneath the flyover must be cleared and the roads laid properly. They said several bus services from Poonamallee, Thiruninravur and other places have been cut as there is no space to park buses, and buses starting from Pattabiram wait at random spots on the CTH Road. They want the Highways Department to also construct a foot overbridge beneath the flyover or a limited-use subway.

Sources said the roundabout would be formed during the widening of the road, and that necessary studies would be taken up regarding a subway or foot overbridge.